Cornerstone Christian Training and Resource Center

You can help us transform this facility into an asset of hope for this community.  
Below is a list of our immediate needs:

Mission Teams are needed for 2008 to help transform the 
Smith Lake School into a new Center for Hope. 


Here is a list of some of the tasks teams will handle:


   
Eastern Section including Roofing for 
    Four-Step Section of 40,000 square feet
:

     1.  Repair cracks on east exterior wall 
     2.  Patch floor 
     3.  Remove carpets / Install floor tiles
     4.  Hang sheet rock, tape and sand 
     5.  Install new windows 
     6.  Install down spout splash 
     7.  Weld and repair entry doors on south wall 
     8.  Install new door handles and locks 
     9.  Install freeze-proof faucets 

     Material Needs:
     1.  25 tubes caulking
     2.  150 gallons interior primer and semi-gloss paint
     3.  Materials to patch floors
     4.  20,000 square feet of carpet
     5.  50 sheets of sheet rock [1/2” x 4’ x 12’]
     6.  50# sheet rock nails / screws
     7.  30 2 x 4 x 16 pine panels
     8.  Roofing materials to cover 40,000 square feet
     9.  Windows – Safety Wired Mash Plate Glass
          a. 3 each -- Ό” x 14 ½’ x 19 ½’ 
          b. 1 each – Ό” x 15 ½’ x 19 ½’ 
          c. 1 each – Ό” x 7’ x 25’
    10. 8 each down spout splash – 12” x 48”


     Southern Section:
     1.  Install safety wired mash plate glass – 4 each 7 x 39
     2.  Install freeze-proof faucets
     3.  Install new door handles and locks


     Material Needs

     1. 4 each 7 x 39 safety wired mash plate glass
     2. 2 freeze proof faucets
     3. 2 sets door handles and locks

    
Western Section:
     1. Install outdoor security lights and outlets
     2. Install safety wire mash glass plates
     3. Weld and repair double entry doors
     4. Install handles and locks
     5. Repair utility doors 
     6. Install new ceiling light

     Material Needs
     1. 8 each -- Outdoor security lights
     2. 5 each security outlets
        a. Locks for entry doors
     3. Frame cast and lattice screen for utility doors
     4. Ceiling light

    
Northern Section:
     1.  Install safety wired mash plate glass
         a. 2 each Ό” x 14 ½ “ x 19 ½” 
         b. 1 each 15 ½ “ x 19 ½ “

     Other Interior Work:
     1. Install lighted exit signs
     2. Install new alarm system
     3. Install 20 new ceiling lights
     4. Lower four ceiling heaters
     5. Install 4,000 feet of commercial vinyl base
     6. Install 40,000 square feet of drop ceiling
     7. Install new fire extinguishers

     Material Needs
     1. 6 each Exit signs 
     2. 20 new ceiling lights
     3. 4,000 feet commercial 4” vinyl base
     4. 30 tubes adhesive
     5. 40,000 square feet of dropped ceiling hardware and tiles
     6. 16 each new fire extinguishers

    
Restrooms:
     1. Replace toilets
     2. Update toilet panels and doors
     3. Adjust urinals

     Material Needs
     1. 9 full size toilets
     2. 2 full size handicap toilets
     3. New toilet panels and doors


Kitchen Area:
 1.  Install new fluorescent ceiling lights
 2.  Install new refrigerators and sinks
 3.  Install new heater
 4.  Install new smoke sensors
 5.  Clean and repair ceramic tile
 6.  Remove or repair floor electric conduit
 7.  General plumbing update
 8.  Install new gas line connection to stoves
 9.  Clean or replace hood vents
10.  Repair double door and install knobs and locks

Material and Equipment Needs
1. 4 regular refrigerators or 2 commercial
2. 2 each stainless commercial sinks
3. 3 each Smoke Sensors
4. Ceramic tiles
5. General plumbing supplies
6. Door locks and knobs

Gym:
1. Install safety glass
2. Install new metal doors with hinges and locks
3. Install new door knobs and locks
4. Clean smoke damage / repair / floor tiles / repaint 
    inside gym

Materials Needed
1. Safety glass
a. 4 each Ό” x 19” x 24”
b. 2 each 19” x 22”
2. 8 each 36” x 84” metal doors with hinges and locks
3. Commercial door handles
4. Paint

Secretary’s Office:
1. Install clear safety glass
2. Install new metal door cases
3. Install new medicine cabinet
4. Replace laminated wall cabinet doors and drawers
5. Replace outlet and switch covers with stainless covers

Materials Needed
1. Clear safety glass plate
a. 1 each Ό” x 45 ½” x 34”
b. 1 each 24” x 34”
c. 1 each 21” x 31 ½ “
2. 1 each medicine cabinet
3. 2 each Ύ” x 14” x 17 ½ “ laminated wall cabinet doors
4. 1 each 8” x 17 ½ “ drawer facing

MDF:
1. Remove or put electrical wire to use
2. Replace Door casings
3. Update AC condenser 

Material Needs
1. New air conditioner condenser
2. 2 sets of 36” x 84” door casings

Training Center:
1. Paint classrooms
2. Replace carpet with carpet tiles

Material Needs
1. 24 each 4’ x 6’ windows
2. 200 classroom chairs
3. PA system
4. Office furniture
5. Good computers
6. Bunk beds for mission teams’ use
7. Floor tiles for 12 each 30’ x 30’ classrooms\remove
    old carpet

Exterior
1.  Paint exterior

Material Needs
1. Exterior primer (50 or 60) 5 gallon cans
2. Exterior Paint (50 or 60) 5 gallons cans